Background

Evolve Demolition was engaged to complete a large-scale commercial strip-out at the former Mitsubishi factory in Silverwater, Sydney. The project formed part of a major redevelopment and required the removal of internal office spaces, amenities, partitions, ceilings, wall linings, and non-structural fixtures while preserving the warehouse’s structural steel framework and concrete floor.


The Challenge

The main challenges for this project were:

Large Industrial Facility:
The size of the warehouse required careful planning and coordination to ensure the strip-out was completed efficiently and safely across a large working area.

Preserving Structural Elements:
The client required all non-structural components to be removed while retaining the building’s structural steel columns, roof structure, external walls, and concrete slab for future redevelopment.

Heavy Demolition Waste:
The project generated a significant volume of timber framing, plasterboard, ceiling materials, plumbing fixtures, electrical components, and office fit-out waste that needed to be sorted and removed efficiently.

Strict Safety Requirements:
Working within an industrial environment required strict adherence to Work Health and Safety (WHS) regulations and comprehensive site management throughout the demolition process.


Our Approach

To address these challenges, we tailored our approach as follows:

Comprehensive Site Assessment and Planning:
Our team completed a detailed inspection of the facility and developed a staged demolition plan to ensure the strip-out was completed safely, efficiently, and in line with the redevelopment schedule.

Systematic Commercial Strip-Out:
We carefully removed internal offices, amenities, partition walls, ceilings, plumbing fixtures, electrical services, and joinery while protecting the building’s structural framework and concrete flooring.

Efficient Waste Management:
All demolition materials were separated on-site, with recyclable materials diverted to licensed recycling facilities wherever possible. Remaining waste was removed promptly to maintain a safe and organised worksite.

Safety and Compliance:
Throughout the project, our experienced demolition team followed strict NSW Work Health and Safety (WHS) procedures, ensuring all works were completed safely, professionally, and in full compliance with industry standards.


Results

  • The complete commercial strip-out was delivered safely and within the agreed project timeframe.
  • All internal offices, amenities, partitions, ceilings, and non-structural elements were successfully removed.
  • The warehouse’s structural steel framework and concrete floor were fully preserved for redevelopment.
  • Demolition waste was efficiently managed, with recyclable materials diverted from landfill wherever possible.
  • The site was left clean, clear, and ready for the next phase of construction.

Outcome

Through careful planning, experienced project management, and efficient demolition techniques, Evolve Demolition successfully transformed the former Mitsubishi factory into a redevelopment-ready site. The client received a clean, structurally sound warehouse prepared for its next stage of construction, with the project completed safely, on schedule, and in accordance with all environmental and safety requirements.

For more information about our Commercial Strip-Out, Industrial Demolition, and Warehouse Strip-Out services, explore our full range of demolition solutions.

Our process and experience is super easy

Our simple 3 step process

01

Sign
Free Quote & Site Inspection

02

Sign
Stripping & Demolition

03

Site Clean Up & Removal of Rubbish
Free Quote